Handover cleaning after construction and renovation
The final step of a building project determines the first impression. Shinesta removes building dust, stickers and residue, so your new build or renovation is clean at the moment of handover.

What we do for you
What's included
- Removing building dust from walls, ceilings, pipes and frames
- Making floors dust-free and wet-cleaning them
- Removing stickers, film and protective layers
- Removing paint splashes and residue from sealant, glue and cement
- Washing windows and glass, the outside by arrangement
- Making kitchens and washrooms ready for use
- Wiping down doors, switches, radiators and windowsills
- Including stairwells, halls, access galleries and storage rooms
Why handover calls for its own clean
At the end of a building project, every day counts. The last tradespeople have just left, the remaining snags are being dealt with and the handover date is fixed. That's exactly when building dust, stickers, paint splashes and traces of sealant are still in the building. An ordinary clean won't get you there. Building dust is so fine that it keeps settling from pipes, frames and ceilings if it's only removed once.
Good handover cleaning achieves more than a tidy first impression. Finishing defects only really show on a clean surface, so the inspection is about the work and not about the dust. After that, the buyer, tenant or user can get started straight away.
Shinesta takes over this final step from contractors, housing associations and property managers. That way your own people don't have to get to work with a vacuum cleaner and scraper after the finishing work, and you have one party responsible for the end result.

From coarse to fine
Construction cleaning happens in steps. How many steps your project needs depends on its size and the schedule on site.
- During the build. We remove coarse dust and dirt, so the next tradespeople can start on a clean surface.
- After the finishing work. Stickers, film and protective layers come off. We remove paint splashes and traces of sealant and glue, and take most of the building dust off walls, pipes and frames.
- Just before handover. In the final clean, we wipe down all surfaces once more. We wash the glass, wet-clean the floors and make kitchens and washrooms ready for use.
- After the inspection. Does repair work after the inspection create more dust? Then we agree to come back for a last round.
The right approach for every surface
New materials are vulnerable. The same tool or product doesn't work on glass, lacquered wood, aluminium and natural stone. That's why we first check which materials have been used and choose a suitable approach for each surface. We discuss cement film or glue residue that doesn't come off easily with you in advance.

What we go through in the final clean
- Frames and glass. Stickers and film come off, and we clean the tracks, corners and bottom edge of the glass, where building dust collects first.
- Kitchens and washrooms. We remove building dust from cupboards and drawers and make tiles, taps, toilets and shower screens ready for use.
- Floors and skirting boards. We remove protective layers last. After that, we make the floor dust-free and wet-clean it.
- Fittings. We wipe down switches, sockets, radiators and ventilation grilles, because that's exactly where fine dust stays behind.

Has your handover date been set?
Tell us where the project is and when you want to hand over. You will receive a proposal that fits your schedule.
Tailored to the construction schedule
Handover cleaning only works at the right moment. If there's still drilling or sanding going on, the dust is back in no time. That's why we agree in advance with your site manager or project manager when the other tradespeople will be finished, which rooms are free and where we can use water and power. If the schedule shifts, we'd like to hear about it in good time, so we can move with it.
A building site has its own rules. We report to the site manager, follow the safety agreements on location and use the protective equipment that goes with them.
New build, renovation or conversion
In a new build, the building is often empty and we can work through it room by room. In a renovation or conversion, part of the building is sometimes still in use. We then screen off what needs to stay clean and agree which rooms are free and when, so that residents or staff notice as little of it as possible.

What determines the price?
The price depends on the floor area, the type of rooms, the amount of building dust, glass and stickers and the number of steps needed. Accessibility and working height also count. A floor plan or a visit to the project helps us make a clear quote. It shows what we do at each step, so you can include it properly in your project budget.
Stairwells and shared areas
In an apartment complex, stairwells, access galleries, halls and storage rooms are also part of the handover. We include them, so the first impression of the building is right too. Looking for regular stairwell cleaning afterwards? Read more about cleaning for owners' associations.

VCA on the building site
Many contractors ask for VCA for anyone working on site. Shinesta works with VCA and Keurmerk Schoon. VCA shows that safety, health and the environment are arranged in the way we work. Keurmerk Schoon covers matters such as correct administration, the proper application of the collective labour agreement for cleaning and suitable insurance, and is independently audited at least once a year. That limits your risk of chain liability, a subject you'll know well from the construction industry.
After the handover
If a permanent user moves into the building, daily cleaning can follow straight on. We tackle any stubborn dirt that's left with deep cleaning, and window cleaning keeps the windows clear. For a smaller job in an existing rental home, residential cleaning is a better fit.

A clean building on handover day?
Give us the location and the planned handover date. You will receive a clear proposal that fits your construction schedule.
Certified with VCA and Keurmerk Schoon
For which organisations
We tailor the work to your sector and location.
Good to know
Frequently asked questions
What is the difference between construction cleaning and handover cleaning?
Construction cleaning is the collective term for cleaning during and after building work, from the first coarse dust to the final round. Handover cleaning is that final round: after it, the building is ready for the inspection and the new user.
When should I schedule handover cleaning?
Get in touch as soon as the handover date is roughly known. We schedule the final clean as close to the handover as possible, once all dusty work is finished. That way the building really stays clean until the inspection.
Do you also remove stickers, film and paint residue?
Yes, that's part of it. Residue that needs a special approach, such as cement film or sealant on sensitive materials, we look at with you in advance.
Do you also take construction waste?
Construction waste and leftover materials usually belong with the contractor. We clear up small residues released during the cleaning. If more needs to go, we discuss it in advance and include it in the quote.
Question not listed?
Call, email or send us a message. We are happy to help.
Other services

Window cleaning
Windows, glass fronts and glass walls without streaks.
Deep cleaning
Thorough cleaning of floors, washrooms and equipment.
Residential cleaning
For landlords, owners' associations and housing associations.
Want to know who will be working on your premises?
Read more about Shinesta and the way we work.

Prefer to talk it through?
Leave your name and phone number and we will call you back.
We only use your details to call you back. Read our privacy statement.
Or call us: +31 (0)6 86 23 28 24